A repair to the parapet, scheduled for 2017, and never carried out.
In 2014 the parapet was inspected as part of a formal principal inspection. Under Component 4, Parapets and Safety Barrier, the report reads:
“Some loose/missing stones and some repointing is required on both parapets.”
It scheduled two items of work:
| Item | Year | Cost |
|---|---|---|
| K — Masonry repointing | 2017 | €250 |
| J — Masonry repair | 2017 | €200 |
| Total | €450 |
€450. Scheduled for 2017. Never done — through a road reconstruction across that section in 2018 and a reseal of the approach in 2025.